company Blog

Practical insights from our project management, construction management, and quantity surveying teams—focused on delivery, risk, and the realities of building well.

Case Study: When a Contractor-Initiated Façade Change Becomes a Contractual Lesson

Case Study: When a Contractor-Initiated Façade Change Becomes a Contractual Lesson

November 26, 2025

A practical look at how a contractor-initiated design change under FIDIC Red Book 1999 became a Variation in principle—but without cost entitlement due to cause and timing.

Feature Spotlight: Phnom Penh’s Next Decade and the Shift Toward Standards, Coordination, and Long-Term Value

Feature Spotlight: Phnom Penh’s Next Decade and the Shift Toward Standards, Coordination, and Long-Term Value

November 20, 2025

Reflections on Mekarcube’s feature interview discussing how Phnom Penh’s next phase of growth will be shaped by standards, coordination, and long-term operational performance.

When Buildings Make Us Sick — and How BIM Supports Health-Focused Design

When Buildings Make Us Sick — and How BIM Supports Health-Focused Design

November 5, 2025

Why human health is becoming a primary design metric — and how BIM enables healthier, evidence-based architecture.

Smaller Windows, Bigger Efficiency?

Smaller Windows, Bigger Efficiency?

October 27, 2025

In Japan, a quiet design shift is taking place — smaller windows, fewer openings, and smarter efficiency. Could this trend make sense in Cambodia?

Construction Risk #3 – Cost & Financial Risk

Construction Risk #3 – Cost & Financial Risk

October 3, 2025

Cost overruns rarely happen all at once. They appear gradually — through uncoordinated drawings, delayed procurement, and slow reactions. Here’s how proactive cost management protects project vision.

Honoring Traditions, Building Futures

Honoring Traditions, Building Futures

September 19, 2025

This Pchum Ben, we pause to remember and honor our ancestors — carrying the values of respect, reflection, and gratitude into the work we do every day.

Building Better Projects with Better Systems

Building Better Projects with Better Systems

September 16, 2025

At Chenla, we believe great outcomes don’t just happen on site. They’re built on the systems behind the scenes — the tools, processes, and habits that turn good projects into great ones.

Behind Every Project, There’s a Team That Makes It Work

Behind Every Project, There’s a Team That Makes It Work

September 8, 2025

Plans, risks, and budgets get the headlines — but it’s people on site who make projects real. Our Site Engineers keep everything moving, safely and precisely.

Construction Risk #2 – When Time is Really of the Essence

Construction Risk #2 – When Time is Really of the Essence

September 4, 2025

In construction, time is more than a saying — it’s a contractual and financial reality. Every day matters. Here’s how proactive schedule control protects project outcomes.